Through this service, you can obtain a new self-supply licence that allows you to treat wastewater where the production capacity is more than 100 m3/day.
Service Condition:
- Pass the technical, financial, and legal evaluation stage to obtain the eligibility for the service
- Pass the 28 days public notice without external objection
Required documents:
- Engineering drawing of the collection, treatment, and disposal system, including trade effluent discharges
- Recycled Water Safety Plan (RWSP)
- Schematic flow diagram of wastewater system at the site
- Compliance sheet with Abu Dhabi Uniform Plumbing Code 2009
- Schematic flow diagram of collection, treatment, and disposal systems at the site (see Annex 1 for example)
- Process & Instrumentation Drawings (PID)
- Recycled Water & Biosolids Safety Plan
- Reference list of contractor experience in design, installation, and operation
- Detailed operational organizational chart for wastewater systems
- List of procedures for operation and maintenance of wastewater system
- Audited financial statements of Applicant
- Certificate of Completion of Building
- Certificates of Conformity (CoC)
Service Steps:
- Registration (Log in)
- Submit the application through the available channels and upload required documents
- Select the license type
- Receive approval or rejection of application
- Pay applicable fees if application is approved
- Receive the license electronically
Service Beneficial: Government and Business
Service Fees: 50000 AED + Evaluation fee: depending on individual circumstances
Time duration for service completion: 30 working days from full Submission date